Project Description: The Project proposes to develop a mixed-use building on an 81,050-square-foot site with one of two options: a Residential Option and an Office Option. Both options would demolish 32,844 square feet of commercial and vacant residential uses. The Residential Option would develop a new high-rise building with four levels of subterranean parking consisting of up to 429 new residential units, including 36 units designated for Very Low Income households, an approximately 55,000-square-foot grocery store, approximately 5,000 square feet of neighborhood-serving commercial retail uses, and 8,988 square feet of uses in the bungalows. The bungalows would be rehabilitated and adapted for reuse as either restaurants or 12 residential units, in which case the development would still propose a total of 429 residential units. The new building would be 360 feet 4 inches in height when accounting for rooftop mechanical equipment. Overall, the Residential Option would provide approximately 484,421 square feet or a floor area ratio of 5.98 within the Project Site. The Office Option would develop a new high-rise building with eight levels of subterranean parking with approximately 463,521 square feet of office uses and 11,914 square feet of restaurant uses, as well as 8,988 square feet of uses in the bungalows. The bungalows would be rehabilitated and adapted for reuse as either restaurants or nine residential units. The new building would be 303 feet in height when accounting for rooftop mechanical equipment. Upon completion, the Office Option would provide approximately 484,423 square feet or a floor area ratio of 5.98 within the Project Site.
ANTICIPATED SIGNIFICANT ENVIRONMENTAL EFFECTS:
Based on the analysis included in the Draft EIR, the Project would result in significant and unavoidable Project-level impacts related to on-site construction noise, on-site construction vibration (pursuant to the threshold for human annoyance), off-site construction vibration (pursuant to the threshold for human annoyance), and off-site operational noise (Office Option). Implementation of the Project would also result in significant cumulative impacts that cannot be feasibly mitigated related to on-site construction noise, off-site construction vibration (pursuant to the threshold for human annoyance) and off-site operational noise (Office Option). All other potential impacts would be less than significant or mitigated to less-than-significant levels.
FILE REVIEW AND COMMENTS:
Coronavirus (COVID-19) Update
The Department of City Planning recognizes the unprecedented nature of COVID-19, and having been identified as an essential City service, continues to work and respond to all inquiries pertaining to our ongoing efforts to process entitlement applications and study updates to our community plans and citywide policies.
The Draft EIR is also available online at the Department of City Planning’s website at http://planning.lacity.gov/development-services/eir. The DEIR can be purchased on CD-ROM for $5.00 per copy by contacting the planning staff listed below. Copies are also available at the following Library Branches:
- Los Angeles Central Library, 630 West Fifth Street, Los Angeles, CA 90071-2002
- Frances Howard Goldwyn Hollywood Regional Branch Library, 1623 N. Ivar Avenue, Los Angeles, CA 90028-6304
- John C. Fremont Branch Library, 6121 Melrose Avenue, Los Angeles, CA 90038-3501
- Will & Ariel Durant Branch Library, 7140 W. Sunset Boulevard, Los Angeles, CA 90046-4416
If you are unable to access digital copies of the Draft EIR, the Department will attempt to make reasonable arrangements to mail and supply the materials. In addition, physical copies of the Draft EIR and case file can still be viewed at City offices. The Department has implemented additional measures to ensure the safety of the public viewing physical case files, necessitating appointments.
The Draft EIR and the documents referenced in the Draft EIR are available for public review by appointment only, at the City Planning offices located at 221 N. Figueroa Street, Suite 1350, Los Angeles, CA 90012, during office hours Monday–Friday, 9:00 A.M.–4:00 P.M. Please contact the Staff Planner listed below to schedule an appointment.
If you wish to submit comments following review of the Draft EIR, please reference the Environmental Case No. above, and submit them in writing by Monday, July 25, 2022, no later than 4:00 P.M.
Please direct your comments to:
- Rey Fukuda
- City of Los Angeles, Department of City Planning
- 221 N. Figueroa Street, Suite 1350
- Los Angeles, CA 90012-2639
- (213) 847-3686
- rey.fukuda@lacity.org