Project Description: The East End Studios ADLA Project involves the development of a new multi-story production studio campus totaling 675,611 square feet of floor area on an approximately 14.6-acre (635,551 net square-foot) site. The Project would include 299,012 square feet of studio uses within five studio buildings; 69,192 square feet of production support space within three covered areas, adjacent to the studio buildings; and 307,407 square feet of office use within two five-story buildings. Up to 8,000 square feet of ground floor areas within the office buildings could be utilized as retail space, including up to 4,000 square feet of restaurant space, or as additional common areas for the office tenants. Two existing warehouse structures totaling approximately 311,000 square feet would be demolished.
ANTICIPATED SIGNIFICANT ENVIRONMENTAL EFFECTS:
Based on the analysis included in the Draft EIR, implementation of the Project would result in significant and unavoidable impacts related to: Noise (project-level and cumulative on- and off-site construction) and Vibration (project-level on- and off-site construction and cumulative off-site construction, with regard to human annoyance). All other potential impacts would be less than significant or mitigated to less-than-significant levels.
FILE REVIEW AND COMMENTS:
The Draft EIR and the documents referenced in the Draft EIR are available for public review at the City of Los Angeles, Department of City Planning, 221 N. Figueroa Street, Suite 1350, Los Angeles, CA 90012, during office hours Monday–Friday, 9:00 A.M.–4:00 P.M. Please contact the Staff Planner listed below to schedule an appointment.
The Draft EIR is also available at the following Library Branches:
Los Angeles Central Library, 630 West Fifth Street, Los Angeles, CA 90071
Little Tokyo Branch Library, 203 South Los Angeles Street, Los Angeles CA 90012
Benjamin Franklin Branch Library, 2200 First Street, Los Angeles, CA 90033
If you wish to submit comments following review of the Draft EIR, please reference the Environmental Case No. above and submit them in writing by Monday, September 9, 2024, no later than 4:00 P.M.
Please direct your comments to:
Mail:
Erin Strelich
City of Los Angeles, Department of City Planning
221 N. Figueroa Street, Suite 1350
Los Angeles, CA 90012
Email:
erin.strelich@lacity.org
Draft EIR Sections
Draft EIR Appendices